National Museum Depository
This was a very demanding job, especially in terms of statics and load-bearing capacity of individual components. It is a built-in floor with storage space for a new depository, the order was realized in 2012.
This was a very demanding job, especially in terms of statics and load-bearing capacity of individual components. It is a built-in floor with storage space for a new depository, the order was realized in 2012.